Key facts & figures of Pier C/D at a glance:

- construction period 20 months

- costs 340 million Euro

- two-level boarding of
  550 passengers/flight

- additional capacity of 4 million
  passengers/year

- 90-meter-long baggage carousels

- End of March 2008: Inauguration of the
  new terminal section


Frankfurt Airport is ready for the future

 

Starting with the Summer Timetable 2008, the new terminal section connecting Terminals 1 and 2 at Frankfurt Airport will be gradually implemented. Passengers are able to access the new Pier C/D via a connecting corridor from the expanded Hall C and board Airbus A380s or other widebody aircraft on two levels.

 

The expanded Pier C/D offers a new boarding experience for passengers. Featuring a lounge character, the new pier offers economy, business, and first-class passengers a unique premium product: direct boarding from their own lounges and on separate levels.

 

Thus, Fraport is a pioneer in infrastructure preparations for new mega airliners like the A380.